J. TROUVAS & Co
The slaughterhouse is installed in THEOLOGOS area in central Greece and has a capacity of 30.000 poultries per day.
The WWTP was constructed in 1995 and since then is in good operation.
It includes the following stages:
Screening (type Parkwood screen).
Equalization tank.
DAF.
Aeration.
Land disposal (irrigation).
Sludge dewatering (drying beds)


